AttributesValues
rdf:type
schema:name
  • this isn’t correct. according to timetables from july 1900, the quickest time for a train to get from derry/londonderry to belfast was 2hrs 55mins. this is 43 minutes longer than today’s trains, which take 2hrs 12mins.the journey, both then and now, follows around 95 miles of rail track. however, while the overall route may be similar, one thing has changed a lot: the number of stops.
schema:sameAs
schema:ratingValue
  • This isn’t correct. According to timetables from July 1900, the quickest time for a train to get from Derry/Londonderry to Belfast was 2hrs 55mins. This is 43 minutes longer than today’s trains, which take 2hrs 12mins.The journey, both then and now, follows around 95 miles of rail track. However, while the overall route may be similar, one thing has changed a lot: the number of stops.
schema:author
Faceted Search & Find service v1.16.115 as of Oct 09 2023


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3238 as of Jul 16 2024, on Linux (x86_64-pc-linux-musl), Single-Server Edition (126 GB total memory, 2 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2025 OpenLink Software